Project Background
The sixth phase of the Data Center of Jiangxi Provincial Public Security Department officially commenced planning and construction in early 2020 and completed bidding by the end of the year. Shenzhen Hailianxin, in collaboration with Beijing Talent, won the bidding project with a comprehensive product solution. This project involved the renovation and connection of a series of power distribution products for 180 cabinets, including the front-end low-voltage distribution room, power supply access for the data center, UPS input and output access, and connection from the end-of-row cabinet to PDU. A 2N+1 power supply scheme was adopted to ensure data security.
Solution
The project deployed 4 front-end GCK drawer cabinets, multiple UPS input and output distribution cabinets, multiple data center power cabinets, several hot-swappable and expandable precision end-of-row cabinets, and intelligent busbars.
Project Significance
- Fixed partitioned cabinets were cleverly arranged to ensure maintenance space, significantly improving space utilization, equipment maintainability, and safety.
- The low-voltage power distribution room underwent a renovation to meet increased power supply demands.
- The safe and reliable operation of the data center was guaranteed.